{"id":1723,"date":"2021-09-25T11:11:00","date_gmt":"2021-09-25T03:11:00","guid":{"rendered":"https:\/\/jeffooi.com\/?p=1723"},"modified":"2021-09-30T11:42:12","modified_gmt":"2021-09-30T03:42:12","slug":"news-clip-elevated-bridge-alternative","status":"publish","type":"post","link":"https:\/\/jeffooi.com\/?p=1723","title":{"rendered":"News-clip: Elevated bridge alternative"},"content":{"rendered":"\n<blockquote class=\"wp-block-quote\"><p>\u201cAccording to our consultant, it is more viable to build a bridge because it is more cost-effective and environmentally friendly than the undersea tunnel.<\/p><p>\u201cBased on preliminary discussions, it is most probably going to be the bridge, but it is still up to the Penang government,\u201d said <strong>Tan Sri Dr Khor Eng Chuen<\/strong>, ECK Development group managing director.<\/p><\/blockquote>\n\n\n\n<!--more-->\n\n\n\n<p>By\u00a0<a href=\"https:\/\/www.thestar.com.my\/authors?q=DAVID+TAN\">DAVID TAN<\/a>\u00a0and\u00a0<a href=\"https:\/\/www.thestar.com.my\/authors?q=IMRAN+HILMY\">IMRAN HILMY<\/a> &#8211; Saturday, 25 Sep 2021<\/p>\n\n\n\n<p>GEORGE TOWN: The Penang government\u2019s controversial undersea tunnel project looks likely to be scrapped for an elevated bridge that would be much less costly in terms of both money and environmental impact.<\/p>\n\n\n\n<p>The mega project has been mired in controversy from the day then chief minister Lim Guan Eng first announced it in 2011, with the local community complaining about the impact on the livelihood of fishermen and possible erosion of the coastline.<\/p>\n\n\n\n<p>And now, a decade later, the 6.5km undersea tunnel project is unlikely to take off as the consortium for the tunnel project has proposed replacing it with a 5km elevated bridge.<\/p>\n\n\n\n<blockquote class=\"wp-block-quote\"><p>\u201cAccording to our consultant, it is more viable to build a bridge because it is more cost-effective and environmentally friendly than the undersea tunnel.<\/p><p>\u201cBased on preliminary discussions, it is most probably going to be the bridge, but it is still up to the Penang government,\u201d said Tan Sri Dr Khor Eng Chuen, ECK Development group managing director.<\/p><\/blockquote>\n\n\n\n<p>The group recently acquired a majority stake in <strong>Consortiu<\/strong>m Zenith Construction, the special purpose vehicle that was to undertake the undersea tunnel project.<\/p>\n\n\n\n<p>It is understood that the bridge alternative would cost about RM3bil, half the cost of the RM6.3bil undersea tunnel.<\/p>\n\n\n\n<p>\u201cAn undersea tunnel would have to be buried deep beneath the sea. If not, it would hinder the passage of vessels entering the port,\u201d said a source familiar with the project.<\/p>\n\n\n\n<p>\u201cCurrently, the navigational channel depth at the Penang Port is about 11m, and it has to be deepened to 15m before big vessels can enter.<\/p>\n\n\n\n<p>\u201cUnder the 10th Malaysia Plan (2011-2015), there was a RM350mil allocation to execute dredging of the sea channel, but that project failed to take off,\u201d added the source.<\/p>\n\n\n\n<p>The newly proposed elevated bridge will connect Gurney Drive and Jalan Teluk Ayer Tawar, linking the bridge to the proposed Northern Corridor Highways (NCH) that comes under the 12th Malaysia Plan (12MP).<\/p>\n\n\n\n<p>Prime Minister Datuk Seri Ismail Sabri Yaakob is expected to table the 12MP in Parliament on Monday.<\/p>\n\n\n\n<p>NCH comprises the 77km Sungai Petani-Serdang route, the 25.5km Bandar Baru-Batu Kawan route, and 37km Bandar Baharu-Changkat Jering route.<\/p>\n\n\n\n<p>Real Estate and Housing Developers\u2019 Association (Penang) chairman <strong>Tan Hun Beng<\/strong> said: \u201cIt is a good idea to put in place a bridge as a third link.<\/p>\n\n\n\n<p>\u201cA bridge will cost less to build, requiring a shorter period to complete. Both a bridge and an undersea tunnel serve the same purpose.<\/p>\n\n\n\n<p>\u201cSo, why not opt for a cheaper alternative, especially in times when building material prices have skyrocketed \u2013 the price of steel and cement increased recently by 30% to 40%.\u201d<\/p>\n\n\n\n<p>The Penang undersea tunnel is one of the four infrastructure projects under the Penang Transport Master Plan to ease the chronic traffic congestion.<\/p>\n\n\n\n<p>The other highway projects are the 4.2km Gurney Drive-Lebuhraya Tun Dr Lim Chong Eu Bypass, the 4.6km Lebuhraya Tun Dr Lim Chong Eu-Bandar Baru Air Itam Bypass and the 12km Tanjung Bungah-Teluk Bahang paired road.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<p>Reference URL: <a href=\"https:\/\/www.thestar.com.my\/news\/nation\/2021\/09\/25\/elevated-bridge-alternative\">https:\/\/www.thestar.com.my\/news\/nation\/2021\/09\/25\/elevated-bridge-alternative<\/a> <\/p>\n","protected":false},"excerpt":{"rendered":"<div class=\"mh-excerpt\"><p>\u201cAccording to our consultant, it is more viable to build a bridge because it is more cost-effective and environmentally friendly than the undersea tunnel. \u201cBased on preliminary discussions, it is most probably going to be <a class=\"mh-excerpt-more\" href=\"https:\/\/jeffooi.com\/?p=1723\" title=\"News-clip: Elevated bridge alternative\">[&#8230;]<\/a><\/p>\n<\/div>","protected":false},"author":2,"featured_media":1260,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[68],"tags":[72],"jetpack_featured_media_url":"https:\/\/jeffooi.com\/wp-content\/uploads\/2021\/07\/LGE_SPUT-04-1.jpeg","_links":{"self":[{"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/posts\/1723"}],"collection":[{"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/jeffooi.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1723"}],"version-history":[{"count":1,"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/posts\/1723\/revisions"}],"predecessor-version":[{"id":1724,"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/posts\/1723\/revisions\/1724"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/jeffooi.com\/index.php?rest_route=\/wp\/v2\/media\/1260"}],"wp:attachment":[{"href":"https:\/\/jeffooi.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1723"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/jeffooi.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1723"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/jeffooi.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1723"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}